Drainage Pump Station No. 3

Project Description

Engenuity Group, Inc. prepared the contract documents, administered bidding, observed construction, and administered the construction contract for replacement of two of the 5 diesel engines that run the pumps. The engines were 450 horsepower, 6 cylinder, with 855 cubic inches of displacement. The transmissions and keel coolers were also replaced. Keel coolers are submerged and are cooled by the water as opposed to a radiator that is cooled by air. The construction cost was $358,857.

Project Details

Contact: Tanya Quickel (561) 793-0874

Client: Drainage Pump Station No. 3
Engine Replacement
Indian Trail Improvement District
West Palm Beach, Florida

Project Status: Construction Completed
June 2010