Coventry Lane and Ryder Cup Boulevard drainage improvements and roadway resurfacing included design, permitting, construction observation, and construction administration. Due to “perched” soil conditions Engenuity Group, Inc. designed a swale section that eliminated standing water by the use of an engineered soil mix and an underdrain system. The drainage improvements also included the addition of drainage structures and regrading of the swales. Pavement resurfacing included
milling of the existing asphalt and placement of an asphalt overlay.

Project Details

Contact: Dan Beatty, P.E., Deputy Director
Northern Palm Beach County
Improvement District
359 Hiatt Drive
Palm Beach Gardens, FL 33418
(561) 624-7830

Client: Coventry Lane and
Ryder Cup Boulevard Improvements
Project Status: Construction Completed
December 2007